• Golden Baban, 05 (GFL), Road # 01, Nikunja-2, Dhaka
Screenshot 2025-07-03 025602
Screenshot 2025-07-03 025546
Screenshot 2025-07-03 025523

Gulshan Center Point

The Gulshan Center Point Project seems to be a commercial or industrial development, possibly a shopping mall, office complex, or a multi-purpose building. The project involves the installation of HVAC systems, which are critical for maintaining air quality, temperature, and humidity levels.
Read More
Screenshot 2025-07-03 024927
Screenshot 2025-07-03 024656

Factory Project @ Eskaef

The Eskaef Factory Project is an industrial setup that involves the installation and integration of complex systems, likely focused on cooling and HVAC (heating, ventilation, and air conditioning). The factory uses large-scale machinery and systems designed to manage the temperature and environmental conditions of the production facility.
Read More
Screenshot 2025-07-03 030152
Screenshot 2025-07-03 030214
Screenshot 2025-07-03 025602

Project Material Inspection

The HVAC system in any commercial building requires a complex network of pipes, ducts, and various components that work in unison to regulate the climate, ensure the proper flow of air, and maintain optimal conditions for both occupants and equipment.
Read More

Airport Under United Enterprise

The HVAC system in an airport is critical for controlling temperature, air quality, and humidity across various terminal areas, including check-in zones, waiting areas, baggage claim areas, and administrative offices.
Read More

Project @ DFBL Norshindi

The DFBL Norshindi Project involves the installation of backup power generation systems that are essential for ensuring uninterrupted electricity supply to the facility.
Read More

Gen Project @ Norshindi

The generator control panel at the DFBL Norshindi Project is an essential component for ensuring the smooth and efficient operation of the diesel generator.
Read More